Monthly Archives: July 2016

Brief Update- Derby Engineering Meeting

The George the Fifth Engineering Team met for one of their regular meet ups in Derby. A lot has been going on, especially in relation to calulations and stress analysis of various interlinked components- the detail of which was discussed at great length. With the valve gear continuing to be central to this, whilst the the alterations in standards which the build continues to keep actively on top of in order to satisfy the necessary parties to achieve mainline running.

Posted in General News | Leave a comment